Roll up installation 9, Figure 1, Figure 2 figure 3 figure 4 – Poly-Tex FieldPro Gothic User Manual
Page 12: Part identification

CF
CG
CH
FIGURE 1
MV1000
ROLL-UP UNIT NS104
RC1310
CRADLE ASSY WITH S HOOK
RC1009
GEARBOX EXTENSION
W/BOLT
RC1010
TUBE CLIP
ROLL-UP 1.315
ROLL UP INSTALLATION
9
REV: AH-120507
1. INSTALL WIGGLE WIRE BASE, CORNER POLY PANEL, AND WIGGLE WIRE TO SECURE PANEL.
2. TO INSTALL ROLL UP CURTAIN POLY, EXTEND CURTAIN POLY ABOUT 2" BEYOND FRAME AND APPROXIMATELY 2" ABOVE
UPPER RAIL. KEEP AS EVEN AS POSSIBLE. FIGURE 1 ATTACH POLY TO WIGGLE WIRE BASE WITH WIGGLE WIRE SIMILAR
TO FIGURE 4 ON PAGE 8. AFTER POLY IS SECURE, MEASURE DOWN 56" FROM TOP RAIL AND PLACE A SERIES OF MARKS
ON POLY USING A MARKING PEN.
3. ASSEMBLE 11' ROLL UP TUBE SECURE SECTIONS TOGETHER WITH #12 x 1" SELF DRILLING SCREWS. FIGURE 2
4. USE THE MARK TO ALIGN ROLL UP TUBE WHILE SNAPPING ON TUBE CLIPS. FASTEN CURTAIN TO TUBE USING CLIPS EVERY
3' KEEPING TUBE STRAIGHT WITH PLACEMENT MARKS. FIGURE 3
5. DIG A 5" DIA HOLE 8" DEEP FOR HT GEARBOX VERTICAL.
6. ATTACH ROLL UP UNIT AND GEARBOX EXTENSION TO TUBE. FIGURE 4 INSERT GEARBOX TUBE THROUGH UNIT AND SET
THE PLATE OF THE VERTICAL INTO THE GROUND UNTIL 12" OF TUBE EXTENDS ABOVE UPPER RAIL. BACK FILL THE HOLE.
7. RETAIN OTHER COMPONENTS FOR INSTALLATION AFTER ROOF POLY.
RC1311
BRACKET WITH
S HOOK
FIGURE 2
FIGURE 3
FIGURE 4
HT1002
HT GEARBOX VERTICAL (70")
GEARBOX
EXTENSION
ROLL-UP TUBE
#12-14 x 1" SELF
DRILLING SCREW
LENGTH AS
REQUIRED
2"
2"
56"
ROLL UP
TUBE
POLY CURTAIN
POLY
CURTAIN
1"
1"
#12-14 x 1" SELF
DRILLING SCREW
PART IDENTIFICATION
9"
12"
PLACEMENT
MARK
GEARBOX
VERTICAL
TUBE
ROLL UP
UNIT
PLACE MARKS
ON POLY
CORNER
POLY PANEL
24"
8"
HOLE
GRADE