11 powering on the system, 12 powering off the system, 13 mounting the system – IEI Integration AFL2-W19A-H61 v1.11 User Manual
Page 80: Owering, N the, Ystem, Ff the, Ounting the, 11 p o we rin g on th e s ys te m, 12 p o we rin g off th e s ys te m

AFL2-W19A/AB-H61
P a g e 61
S te p 2:
Press the reset button.
S te p 0:
5.11 P o we rin g On th e S ys te m
To power on the system, follow the steps below:
S te p 1:
Locate the Function and Brightness Up function keys. See Section 1.2.1.1.
S te p 2:
Hold down the Function and Brightness Up buttons for three seconds to power
on the system.
S te p 0:
5.12 P o we rin g Off th e S ys te m
To power off the system, follow the steps below:
S te p 1:
Locate the Function and Brightness Up function keys. See Section 1.2.1.1.
S te p 2:
Hold down the Function and Brightness Up buttons for six seconds to power off
the system.
S te p 0:
5.13 Mo u n tin g th e S ys te m
WARNING!
When mounting the flat bezel panel PC onto an arm, onto the wall or onto a
panel, it is better to have more than one person to help with the installation
to make sure the panel PC does not fall down and get damaged.
The four methods of mounting the AFL2-W19A/AB-H61 are listed below.
Wall mounting
Panel mounting
Stand mounting
Arm mounting
The four mounting methods are described below.