Vanguard ATRT-01_01B S3 User Manual
Page 36

ATRT-01/01B S3 USER’S MANUAL
REV 1
32
Line 1 of the results shows the Phase A test results, and line 2 shows the Phase B test 
results. 
Press the
[ENTER]
key to continue.
j. The following screen will be displayed showing the Phase C cable connections for the
selected test:
Make the cable connections per the instructions and then press the
[START]
key to
run the Phase C test.
k. The following screen will be displayed while the test is being performed:
The Phase A, B, and C test results will be displayed on the LCD screen when testing has 
finished: 
The phase angles for Phase A, B, and C are also displayed at the bottom of the test 
results from left to right, respectively. Press any key to continue. 
TEST RESULTS:
RATIO MA
%DIFF
A +15.003 001 0.02 
B +15.015 001 0.10 
C +15.000 001 0.00 
181.4
° 183.2° 181.8°
XFMR TYPE: DYN1
TESTING: 
DYN1 phase C 
 
 
 
 
 
PHASE C
 CABLE XFMR 
 X1,X2 to x3,x0 
 h1,h2 to h3,h2 
 
 
"START" when READY
RATIO MA
%DIFF
 
+15.003 001 0.02 
+15.015 001 0.10 
 
 
"ENTER" TO CONTINUE.. 
