beautypg.com

Vanguard ATRT-01_01B S3 User Manual

Page 35

background image

REV 1 ATRT-01/01B S3 USER’S MANUAL

31

Make the cable connections per the instructions and then press the

[START]

key to

run the Phase A test.

g. The following screen will be displayed while the test is being performed:

The Phase A test results will be displayed on the LCD screen when testing has finished:

Press the

[ENTER]

key to continue.

h. The following screen will be displayed showing the Phase B cable connections for the

selected test:

Make the cable connections per the instructions and then press the

[START]

key to

run the Phase B test.

i. The following screen will be displayed while the test is being performed:

The Phase A and B test results will be displayed on the LCD screen when testing has
finished:

TESTING:
DYN1 phase B





PHASE B

CABLE XFMR
X1,X2 to x2,x0
h1,h2 to h2,h1


"START" when READY

RATIO MA

%DIFF


+15.003 001 0.02



"ENTER" TO CONTINUE..

TESTING:
DYN1 phase a