T/pi/160 installation instructions installation – TREND T_PI_160 User Manual
Page 2

2
T/PI/160 PRT Immersion Temperature Sensor Installation Instructions TG100310A Issue 3/C 25/06/07
T/PI/160
Installation Instructions
INSTALLATION
(Continued)
Mount on Wall
3
a
b
85 mm (3.35”)
Drill 2 pilot holes
Tighten 2 screws
2 off No 6 screws
Install pocket
4
Install sensor into pocket
5
b
c
(if installing new pocket)
a
Drill hole for boss
Fix threaded boss
Screw pocket into boss
½” BSPT threaded boss
apply sealent to
boss thread
a
b
If using compatible pocket
If using universal adaptor
use 2 mm hexagonal
socket key
(i) Push adaptor onto probe
(ii) Adjust probe length
if pocket has clip retaining
groove, push clip over
pocket
if pocket has grub
screw, discard
spring and clip
clip
spring
brass brush
tighten
use 2 mm
hexagonal socket key
pocket
length
clip engages
in groove
tighten screws
Remove lid
6
a
b
probe is forced against
end of pocket
tighten screw
over bush
(iii) Fix to pocket
use M27
spanner
- PN-VPC (2 pages)
- DPCM (24 Vac_dc) (4 pages)
- 2VID (24 Vac_dc) (4 pages)
- 6RM_24VAC (4 pages)
- 3RM_24VAC (4 pages)
- 2RM_24VAC (4 pages)
- 2SRM (24 Vac_dc) (4 pages)
- SRMAC (4 pages)
- 4DiX_24Vac (4 pages)
- AD20-xx (4 pages)
- AD05-xx (4 pages)
- AL0406-P-SU (2 pages)
- AL0206-P-K (2 pages)
- ACCA_VB_ADK (1 page)
- AT0102-24 (2 pages)
- V162X (4 pages)
- V584 (2 pages)
- V583 (2 pages)
- NXIP (8 pages)
- NXNI (8 pages)
- NX Variable Speed Drives (136 pages)
- NXL Variable Speed Drives (12 pages)
- XW_R_IQ (4 pages)
- ACCW_RW_IQ (4 pages)
- TW_S (4 pages)
- TW_P (4 pages)
- PCW_... (4 pages)
- OCC_U (4 pages)
- LLO (4 pages)
- LLS (4 pages)
- WS_R (2 pages)
- WS_S, _SD (4 pages)
- AQ_S (4 pages)
- AQ_D (4 pages)
- DPSL (4 pages)
- DPSA (4 pages)
- PIl3 (4 pages)
- DPIL (4 pages)
- DPIA (2 pages)
- HT_O (8 pages)
- HT_D (4 pages)
- HT_S (4 pages)
- T_FS (4 pages)
- T_FG (4 pages)
- T_AV (4 pages)