beautypg.com

Part 12, Maintenance, A. maintenance procedures – HTP EL-399 User Manual

Page 72: Part 12 – maintenance

background image

72

LP- 293 REV. 5.20.14

Table 28









PART 12 – MAINTENANCE

A. MAINTENANCE PROCEDURES

Periodic maintenance should be performed once a year by a qualified service technician to assure that all the equipment is operating
safely and efficiently. The owner should make necessary arrangements with a qualified heating contractor for periodic maintenance of
the boiler. The installer must also inform the owner that a lack of proper care and maintenance of the boiler may result in a hazardous
condition.

BEFORE EACH HEATING SEASON a trained and qualified service technician should perform the inspections as per the boiler
inspection and maintenance schedule in the back of the manual. Failure to do so could result in death or serious injury.

This manual is related to the following products: