HTP EL-399 User Manual
Page 22
22
LP- 293 REV. 5.20.14
Figure 9
– LP-293-P
NOTES:
1. This drawing is meant to show system piping concept only.
2. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
3. Piping shown is Primary/Secondary.
4. System flow (secondary loop) should be greater than the boiler primary loop flow. In all cases, the boiler primary loop flow rate must be maintained
above the minimum flow rates published on p. 28, this manual.
5. Installations must comply with all local codes.