H. sidewall venting – HTP EL-399 User Manual
Page 34
34
LP- 293 REV. 5.20.14
DESCRIPTION
STOCK CODE
3” PVC CONCENTRIC VENT TERMINATION KIT
KGAVT0601CVT
3” STAINLESS STEEL VENT TERMINATION KIT
V1000
4” STAINLESS STEEL VENT TERMINATION KIT
V2000
6
” STAINLESS STEEL VENT TERMINATION KIT
V3000
3” POLYPRO VENT KIT
8400P-001
Table 12
H. SIDEWALL VENTING
NOTE:
Vent piping should be 12” over anticipated maximum snow level.
NOTE: Drawing is meant to demonstrate system venting ONLY.
All vent pipes must be glued, properly
supported, and the exhaust must be pitched a minimum of ¼” per foot back to the boiler to allow
drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the boiler and the
balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the
boiler.
Figure 14
– Sidewall Venting with Tee (Intake) and Coupling (Exhaust) – LP-293-E