beautypg.com

HTP EL-399 User Manual

Page 6

background image

6

LP- 293 REV. 5.20.14

F. LONGER VENT RUNS ............................................................................................................................................................. 32

G. EXHAUST VENT AND INTAKE PIPE INSTALLATION ............................................................................................................ 33

H. SIDEWALL VENTING .............................................................................................................................................................. 34

I. VERTICAL VENTING................................................................................................................................................................. 35

J. HORIZONTAL VENTING .......................................................................................................................................................... 36

K. UNBALANCED FLUE / VERTICAL VENT ................................................................................................................................ 37

L. VENTING THROUGH AN EXISTING SYSTEM ........................................................................................................................ 37

1. CONCENTRIC VENTING THROUGH AN EXISTING SYSTEM ................................................................................................. 38

2. VENTING AS A CHASE .............................................................................................................................................................. 39

M. INDOOR COMBUSTION AIR INSTALLATION IN CONFINED OR UNCONFINED SPACE .................................................... 40

PART 6

– GAS PIPING .............................................................................................................................................................. 42

A. GAS CONNECTION ................................................................................................................................................................. 42

B. GAS PIPING ............................................................................................................................................................................. 42

C. CHECK INLET GAS PRESSURE............................................................................................................................................. 43

D. BOILER GAS VALVE ............................................................................................................................................................... 44

PART 7

– FIELD WIRING .......................................................................................................................................................... 45

A. INSTALLATION MUST COMPLY WITH: .................................................................................................................................. 45

B. FIELD WIRING TERMINATIONS ............................................................................................................................................. 45

C. FIELD WIRING ......................................................................................................................................................................... 45

D. LINE VOLTAGE WIRING FOR STANDARD BOILER .............................................................................................................. 45

E. ALARM CONNECTIONS .......................................................................................................................................................... 46

F. LOW VOLTAGE CONNECTIONS FOR STANDARD BOILER ................................................................................................. 46

G. THERMOSTAT ........................................................................................................................................................................ 46

H. OUTDOOR SENSOR ............................................................................................................................................................... 46

I. INDIRECT SENSOR .................................................................................................................................................................. 47

J. OPTIONAL 0-10 VOLT BUILDING CONTROL SIGNAL ........................................................................................................... 47

K. OPTIONAL UL353 LOW WATER CUT-OFF INTERFACE KIT ................................................................................................ 47

L. WIRING OF CASCADE SYSTEM COMMUNICATION BUS .................................................................................................... 47

M. CASCADE MASTER PUMP AND SENSOR WIRING.............................................................................................................. 49

N. CASCADE FOLLOWER PUMP AND SENSOR WIRING ......................................................................................................... 49

PART 8

– START-UP PREPARATION...................................................................................................................................... 54

A. CHECK / CONTROL WATER CHEMISTRY ............................................................................................................................. 54

B. CHECK FOR GAS LEAKS ....................................................................................................................................................... 55

C. FREEZE PROTECTION (WHEN USED) .................................................................................................................................. 55

D. FILL AND TEST WATER SYSTEM .......................................................................................................................................... 55

E. PURGE AIR FROM WATER SYSTEM ..................................................................................................................................... 55

F. CHECK THERMOSTAT CIRCUIT(S) ....................................................................................................................................... 56

G. CONDENSATE REMOVAL ...................................................................................................................................................... 56

H. FINAL CHECKS BEFORE STARTING BOILER ...................................................................................................................... 57

I. CASCADE SYSTEM .................................................................................................................................................................. 57

J. LOCKOUT CONDITION ............................................................................................................................................................ 57

This manual is related to the following products: