Insert Hardware
Combine the 1” threaded studs with the flat nuts.
Slide 2 sets of hardware down the two outside
posts and 4 sets down the three center posts.
Allow studs to remain loose at bottom of post.
B
.
Position & Secure Studs
Align the Spacer Tool at the top of each post,
then position top studs through the small “Rear
Panel” hole. Repeat this step with the bottom studs
aligning the Tool along the bottom of post to set
spacing for cable passage. Use the hex key to
secure the top and bottom studs to the posts.
C
.
Place Rear Panels
Secure each panel in place with thumb nuts.
2X
4X
4X
2X
4X
REAR
Attach Rear Panels
B
.
Fine Tuning
Use the bubble level to precisely adjust
the shelves. Be sure to level both sides
as well as front to back. Use the hex
key to tighten each peg.
A
.
Placing & Adjusting Shelves
Place shelves from the bottom up. Angle the
shelf in between the front post and set on top
of shelf pegs. Use the Spacer Tool to adjust
spacing between shelves. Position the peg
through the Spacer and tighten.
5
Final Assembly
4
C
.
Insert Side Panels
Carefully slide side panels down center
channel of outside and center posts as
shown. Be sure the posts are square to
the bottom shelf to prevent any damage
to side panels.
Doc No. 500-255 v 7/11 4 of 4
D
.
Secure Top
Secure top with the 9 connector
bolts to complete installation.