beautypg.com

Fairbanks Aegis Industrial Stainless User Manual

Page 6

background image

The complete installation consists of:

1. Verifying the application

2. Unpacking

3. Floor scale checkout

4. Customer and site readiness:

a. Is the Location ready?

b. Is the customer aware there may be work disruptions?

c. Are the operators available for training?

5. Floor scale connections

6. Adjustments

7. Customer training

C. Pre-Installation

Checklist:

The following points should be checked and discussed with the Area Sales Manager

and/or the customer, if necessary, before the technician goes to the site to install the

equipment.

1. Has the customer's application been checked to make certain that it is within the

capabilities and design parameters of the equipment?

2. If the installation will disrupt the customer's normal operations, is he aware and has

he made arrangements?

3. Is properly grounded power available at the installation location?

4. Will the equipment operator(s) be available for training?

5. Has the service technician thoroughly reviewed the installation procedures?

6. Has the service technician reviewed the recommended setup with the Area Sales

Manager or Area Service Manager, and identified all necessary variations to satisfy

the customer's specific application?

51103

6

01/07 -- Rev. 1

NOTE: It is the owner’s responsibility to document, notify, and follow-up with the carrier if

there is shipping damage.

NOTE: Above ground installations require the scale platform be protected from mobile

machinery that may be present in the area. Fairbanks Scales is not responsible for

damages to unprotected platforms in above ground installations.

This manual is related to the following products: