Adjusting and locking cable assembly, Installing arms, Operator housing – DoorKing 1602 Barrier Gate User Manual
Page 13: Top view of operator housing, Installing hinge plates

1601-267-B-6-11
DoorKing Part Number
1601-084
Copyright 2011 DoorKing, Inc. All rights reserved.
Top View of
Operator Housing
120 Glasgow Avenue
Inglewood, California 90301
U.S.A.
Hub
Existing Stud
Important: Do not adjust cable too tight or it will bind.
Adjusting and Locking Cable Assembly
After adjusting cable tension, lock turnbuckle with nuts in position shown to prevent
turnbuckle from rubbing against hinge plates when the arm is in the UP position.
Rotate arm up and down. Adjust cable tension with turnbuckle
to level outer arm. Make sure that cable assembly is not binding
or twisting and everything moves freely.
Inner Arm
Outer Arm
Outer Arm
1
3A
2A
3A
Install inner arm on hub.
2
Install hinge plates.
3
Install cable. Cable MUST clear hub!
Remove stud from operator housing
and assemble as shown.
Bushing
Operator Housing
Adjust to clear hub.
Pre-Crimped Eyelet
Bolt Head (Inside Housing)
Washer (Inside Housing)
Locknut
Installing Arms
Installing Cable
Attachment Assembly
Side View of
Operator Housing
Cable Eyelet MUST be installed in turnbuckle.
Cable Clamp
Allow turnbuckle to
loosen or tighten.
Cut off excess cable.
Bushing
Turnbuckle
Bolt (Medium)
Bolt (Large)
4 Bolts (Small)
Brass
Bushing
Installing Hinge Plates
Locknut
Locknut
4 Locknuts
2A
Out
er Arm
Inner Arm