Diamond Products SB User Manual
Page 23
SB Wire Sawing System
Connection of hydraulics and water
SB_0107_e.mif
Page 23
,QLWLDO FRPPLVVLRQLQJ
The SB is delivered ready-to-operate. The
points described under "Preparation for work"
are also valid for the initial commissioning of a
new machine.
3UHSDUDWLRQ IRU ZRUN
Always proceed as follows:
l
Clarify the general conditions
l
Make building site safe
l
Establish position and sequence of drilled
holes and cuts
l
Carry out visual inspection
l
Cover sharp-edged scuffing positions
(hoses and wires)
9LVXDO FKHFNV
Check:
1. Oil level in the oil tank of the drive unit
2. Oil losses from hoses and clutches
3. Clutches and couplings for damage and contamina-
tion
4. Hoses, plugs and wires for damage
Position yourself at a suitable
distance and not in the "firing
line" of the wire. If the wire
breaks you are then better pro-
tected.