Unit setup, Warning – Magnum Venus Plastech HYDRAULIC MINI LINK User Manual
Page 20
Mini Link Operations Manual
Rev. 08/2013
Page | 20
Unit Setup:
WARNING
Please observe all warnings before performing any maintenance
Follow the pressure relief procedures in this manual.
Use proper safety gear, gloves and safety glasses.
Turn off electrical equipment associated with system
Clean all tools to be used for repair of grease or other material that can react with the
material being pumped.
1.
Connect air supply to system which requires 90 - 100 psi (6
– 7 bar) supply 5
CFM of clean dry air. When using the air driven mixer, supply air of 20 CFM is
required. Open air manifold ball valve.
2.
Check hydraulic oil level (Chevron Rykon oil AW ISO 46) which has been filled at
the factory.
3.
Connect power supply; the unit is set to customers request at either 120 Volt 22
amps or 220 single phase 13.7 amps. Check that all hose fittings are tight;
inspect condition of hoses that none were damaged in shipping.
4.
Fill solvent container (no more then 2/3 full) with desired solvent, non-flammable
solvents are recommended. Pressurize container from 40 to 60 psi (3
– 4 bar)
with air regulator located on the flush tank.
5.
The Air Purge regulator which is mounted at the top air manifold should also be
set at 40 to 60 psi (3
– 4 bar). The Air Purge is used to air purge the material
from the gun and mixer before and after flushing.
6.
Located on the hose set by the gun is a 3-way ball valve. Rotate the ball valve
handle to the flush position which is the direction pointing to the yellow tubing.
Test solvent flush by pushing flush buttons located on either side of the gun
block. Rotate the ball valve handle to the direction of the clear tubing; push the
flush buttons to air purge the mixer housing. Always rotate the ball valve handle
to the neutral position (center) when flushing/air purge is complete.