Enclosure 8. power connection – Controlled Products Systems Group 104301 User Manual
Page 25

The obstacle detection function is achieved by controlling the
current absorption and / or through the encoder connected to
the motors.
If the gate encounters an obstacle during the movement of
opening or closing, the obstacle detection function is activated
and the operator reverses the direction of the gate.
In case of a second consecutive obstacle the operator stops
the gate right away and any further command is inhibited. To
re-enable the automation, you must remove power or open the
STOP contact input. Until this “reset” the Audio Alarm output
will be active.
7. At the point where you want the slowdown to start give an
OPEN A command with the push button or the remote that
is already stored in memory. Leaf 2 starts to slow down and
stops when it reaches the mechanical stop or FCA2.
8. Leaf 2 starts to close at the set speed (trimmer speed).
9. At the point where you want the slowdown to start give an
OPEN A command with the push button or the remote that
is already stored in memory. The leaf 2 starts to slow down
and stops when it reaches the mechanical stop or FCC2.
10. Leaf 1 starts to close at the set speed (trimmer speed).
11. At the point where you want the slowdown to start give an
OPEN A command with the push button or the remote that
is already stored in memory. Leaf 1 starts to slow down and
stops when it reaches the mechanical stop or FCC1.
12. The manual time learning procedure is complete.
15
15/32
”
6 7/32”
17
15/32
”
The E024U board is supplied on a panel that fits in a 16x14”
enclosure.
On the back panel are installed the control board, the power
supply and additional accessories.
Power Supply
AC connection
Power outlet
and switch
Pushbutton
E24U board
DIN rail
Batteries
AC POWER GUIDELINES:
THE E024U control board and power supply uses a single
phase AC power line to operate, charge the batteries, and power
gate accessories. Use the following guidelines when installing
the AC power:
1. Check the local wiring codes in all cases and follow all local
building codes. Wiring and hookup should be performed by a
qualified electrician/installer only.
2. AC power should be supplied from a circuit breaker panel and
must have its own dedicated circuit breaker. This supply must
include a green ground conductor.
3. Use copper conductor wires with liquid tight flexible conduit
UL listed for electric cable protection
14 AWG, 600V, 80°C
Terminal Block max Torque 2.1 Nm
4. Properly ground the gate operator to minimize or prevent
damage from power surges and/or lightning. Use a grounding
rod if necessary. A surge suppressor is recommended for ad-
ditional protection.
6.3 OBSTACLE DETECTION FUNCTION
7. ENCLOSURE
8. POWER CONNECTION
A13
E024U CONTROL BOARD