beautypg.com

Controlled Products Systems Group -108710 User Manual

Page 14

background image

The S800H operator comes with an encoder system that

allows the control board to monitor the postion of the leaf

connected to the operator at any time. The proper assign-

ment of the leaf to the corresponding encoder depends on

the connection of the two encoder wires (leaf 1- encoder 1;

leaf 2 - encoder 2).

DL3

OFF

DL2

ON

Fig. 23

DL2

OFF

DL3

OFF

DL2

ON

DL3

OFF

DL1

ON

DL1

ON

DL1

ON

DL2

OFF

DL3

OFF

DL1

ON

LEAF 1*

TWO LEDs ON

LEAF 2

ONE LED ON

LEAF 1*

TWO LEDs ON

LEAF 2

ONE LED ON

Leaf 1 opens first and close second. if you do

not have a leaf overlap between 1 and 2, the

board may be set with leaf delay equal to zero

Switching the polarity of the encoder’s wires on the

board connector you can change the association of

the encoder to the leaf.

Fig. 24

TABLE 1

LED

ON STEADY

FLASHING

OFF

DL 1 Power ON and encoder communicating

with the control board

Power ON but encoder NOT communica-

ting with the board (eg: wiring error, both

encoders with the same polarity)

Power OFF and no communication (eg: no

power or no connection)

DL 2

Encoder assigned to Leaf 1

/

Encoder assigned to Leaf 2

DL 3

/

Encoder generating pulses during leaf

movement

Leaf not moving

6. ENCODER CONNECTION

To verify the proper assignement of

LEAF 1 - ENCODER 1 -

MOTOR 1 and LEAF 2 - ENCODER 2 - MOTOR 2, you can

use the LEDs visible through the encoder’s shell, as shown

in Figures 23 and 24:
To invert the leaf-encoder combination, change the encoder

polarity by swapping its wires until the right LEDs are lit.

NOTE: THE ENCODER WIRES MUST BE CONNECTED TO THE BUS CONNECTOR OF THE CONTROL BOARD.
Please refer to the E024U board pinout for more information

14

FAAC Model S800H Swing Gate Operator

This manual is related to the following products: