beautypg.com

455 d c – Controlled Products Systems Group 1042001 User Manual

Page 9

background image

Page 9

December, 2003

422 Operator And
455 D Control Panel Installation Manual

I

NSTALLING

THE

455 D C

ONTROL

P

ANEL

Locate the control panel in the most convenient position

possible, considering the movement of the gate. Figure

9 on page 11 shows a basic layout for a two-leaf gate

with the 422 Compact Operator.

Installing the control panel consists of the following

general steps:

Connecting the main power to the control
panel

Connecting the activating device

Connecting the operator to the control panel

Checking the direction of the motor's rotation

Connecting other devices to the control panel

Set operating modes

The installer is responsible for grounding the gate and

operator systems, for providing the main power breaker

switch, and for making sure that the entire gate system

meets all applicable electrical codes.

For the complete 455 D Control Panel Installation

Instructions, see pages 14—25 of this manual.

This manual is related to the following products: