End of installation stage 3 – CAME Ati-S324 Kit User Manual
Page 23

22
PLEASE CHECK THAT YOU HAVE CORRECTLY:
Ref Page
1. SET POWER SETTING, INSERTED MOTOR
CAPACITORS, SET DIPSWITCHES FOR
COMMISSIONING, ENSURE WIRE LINK
IS FITTED BETWEEN TERMINALS 1 & 2
AND 2 & C1
3.1
12
2. SET THE OPENING AND CLOSING TIMES
FOR GATES
3.213
3. ADJUSTED THE CONTROL PANEL
3.3
14
4. IF REQUIRED, ACTIVATED AUTOMATIC
CLOSING AND SAFETY PHOTOCELLS
3.4
15
5. PROGRAMMED THE REMOTE TO THE
CONTROL PANEL
3.5
16
END OF INSTALLATION
STAGE 3
This manual is related to the following products: