beautypg.com

Hellwig Air 6299 User Manual

Page 17

background image

559-734-7451 800-367-5480 FAX 559-734-7460

28. After all connections have been verified, install fuse in inline fuse holder, apply park
brake and start engine with shifter in park or neutral. Due to the amperage draw of the
compressor, failure to turn engine on during initial startup may drain the battery enough to
require a jump start.

29. Test system by adding air to air springs. Disconnect linkage from arm and rotate arm
up to fill air springs. Check all connections with soapy water for leaks. After the integ-
rity of the system is verified, reconnect linkage to valve. A MINIMUM OF 5-10 PSI
MUST BE MAINTAINED IN AIR SPRINGS AFTER INSTALLATION FOR WAR-
RANTY TO BE VALID. FAILURE TO KEEP MINIMUM PRESSURE IN AIR
SPRINGS WILL VOID WARRANTY

.

30. Recheck all components and test drive vehicle. Re-check all components for mount-
ing and proper torque. Check clearance to all vehicle components including suspension
components, exhaust pipe, brake lines, fuel lines, hoses, etc. Re-check installation on a
regular basis afterward. The air tank MUST be drained at least every couple of weeks to
prevent condensation buildup, FAILURE TO REGULARLY DRAIN AIR TANK WILL
VOID WARRANTY

.

6299 ( R-6299)

02/26/2010