Printing, Internal batteries – GxT V016-01, Ferret 16 GasLink II 5-Gas Analyzer User Manual
Page 15
![background image](/manuals/331404/15/background.png)
15
The analyzer will zero the gas bench then ask you to turn on the
gas valve on and adjust the pressure regulator until the bar graph
is between the two arrows.
The analyzer will display a 60 second count down message. If the
calibration was successful you will see the following screen.
If you experience an error in performing a Gas Calibration, please
retry the procedure again. If you still have trouble, contract customer
service at (800) 627-5655 for additional help.
Printing
The GasLink II supports printing to a custom thermal printer. Con-
nections for power and data are made through the RJ-45 connector
found on the back of the analyzer. Simply plug in the printer and
press the PRINT button on the front panel.
Internal Batteries
The GasLink II has three AA batteries that maintain the clock. If
the batteries need to be replaced, remove the back panel of the
analyzer to gain access. The date and time can be set by accessing
the Date and Time functions found in the analyzer setup.