beautypg.com

ADIC FCR 200 User Manual

Page 53

background image

Fibre Channel Connection

4-13

Multi-Mode Fiber Support

1.0625 Gbaud Dual SC
connectors

Single-Mode Fiber Support

1.0625 Gbaud Dual SC
connectors

To connect the FCR200 to the Fibre Channel Storage Area
Network:

1

Locate the Fibre Channel port on the back of the
FCR200.

Figure 4-11

Fibre Channel Port

2

Remove the rubber protector from the GBIC, as
shown in Figure 4-12, and push the metal latch
down to lock it into place.

Figure 4-12

Removal of GBIC Protector