Measures to be taken before putting into service, Pulse operation, English – Burkert Type 6519 User Manual
Page 18: Function
16 - 6518 / 6519
I
NSTALLATION
, I
NITIALISATION
AND
S
ERVICE
english
Measures to be taken before putting into service
Check all connections, voltages and the operational pressure!
Ensure that the max. operational conditions (see rating plate) will not be exceeded!
Check that Ports 1, 3 and 5 are correctly connected according to the regulations. These connections
must not be interchanged for any reason!
When operating electrically, unlock the manual override!
Pulse operation
Function:
ATTENTION!
Observe the “Pulse” data on the rating plate!
Avoid simultaneous pulse input to both coils!
The pulse-controlled solenoid valves operate with two coils connected alternately.
NOTE
The valves can be reversed with the manual actuator.
This manual is related to the following products: