beautypg.com

Dismantling the module, English – Burkert Type 6517 User Manual

Page 15

background image

6516 / 6517 - 13

I

NSTALLATION

, I

NITIALISATION

AND

S

ERVICE

english

Installation

Hang the valve block onto the upper groove of the standard rail.

Latch the lower clamp into the standard rail.

Firmly tighten the screws on the clamp.

Dismounting

Loosen the clamping screws (by about 4 revolutions).

Remove the block upwards from the standard rail.

Dismantling the module

Unlatch both locking hooks by using a screwdriver on the end dismantling-grooves.

Remove the block part / module sideways.

Mounting the valve block

Other possible uses of the connecting module, - right-hand -

• As a separation module for special applications when building up several pressure levels in a single

block

• Additional supply lines for larger valve blocks.

Standard rails

Secure the valves to the base module using 2 M4 screws each.

(Tightening torque max. 1.5 Nm).

Mount the complete valve block onto the wall or the standard rail.

Connect the supply and working lines.

Make the electrical connections to the pilot valves: in doing this, observe the values given on the rating

plate!

• Standard rail 35 x 15 DIN 50022 (Standard)
• Standard rail 75 x 25 DIN 50023

NOTE

When using the 75 x 25 DIN 50023 standard rail, change over the pre-assembled
screws with clamps and springs as necessary.

This manual is related to the following products: