Putting into operation safety notes installation, Operation and function safety notes, English – Burkert Type 0250 User Manual
Page 18

18 - 0250
english
english
english
english
puttInG Into operatIon
safety notes
Installation
you can install the motorised regulating valve in any position, but preferably with
the drive axis vertical.
single blocks are secured with tie rods or angle brackets, and dual and quad blocks
with angle brackets.
note
if connection sizes or angled connections other than those set up in
the factory are required, the valve must be converted by the factory.
this also applies to changes to the serial connection of the modules.
operatIon and FunCtIon
safety notes
attentIon!
Before putting the motorised control valve into operation,
ensure that
• the electrical power supply corresponds to the voltage quoted
on the rating plate,
• the electrical connections habe been carried out as described
in the technical data chapter.
• the motorised regulating valve is only used in its original confi-
guration and must not be dismantled,
• all hoses are securely connected to the hose connections.
danger of scaling!
attentIon!
observe the following during operation
• compliance with the general technical rules!
• the valid accident prevention and safety regulations for electrical
devise.