J&M GC-24T Assembly User Manual
Page 44

GC24
t
-1 G
rain
C
art
a
ssembly
-44-
STEP - 82
Hitch Weldment
1” x 7-1/2” Hex Bolt
2-1/2” Hitch Spindle
2-1/2” Sleeve
3/4” x 3” Hex Bolt
Hitch Plate Weldment
1” Centerlock Hex Nut
1” x 4-1/2” Hex Bolt
2-1/2” Spindle Collar
-Non-Scale Option-
Assemble the Hitch Spindle Sleeve and Hitch Weldment. Use a 1.0” x 7-1/2” Hex Bolt and a 1” Centerlock
Hex Nut to fasten the two together.
Next attach the Hitch plate Weldment to the grain cart’s A - frame. Use (8) 3/4”-16 x 3.0” Hex Bolts to at-
tach the weldment to the frame.
Now slide the Hitch Spindle through the Hitch Plate Weldment. Slide the Hitch Spindle Collar onto the
Hitch Spindle Sleeve. Fasten the two together using a 1” x 4-1/2” Hex Bolt and a 1” Centerlock Hex Nut.
Fasten all of the hardware once finished.
*When ready for transport, the bolts on the Hitch
Weldment need to be on the bottom side.
- 525-14W (31 pages)
- 750-16 (33 pages)
- 750-18 (34 pages)
- 1000-20 (31 pages)
- 1050-20 (37 pages)
- 1130-20 (36 pages)
- 1325-20 (36 pages)
- GC-24T Manual (39 pages)
- GC-31T Manual (38 pages)
- GRAIN CARTS Leaner Setup (18 pages)
- 250-7S (12 pages)
- 385SD (13 pages)
- 440SD (13 pages)
- 680SD (13 pages)
- 750SD (13 pages)
- GW15t-1 (20 pages)
- 275ST (62 pages)
- 375ST (62 pages)
- 500ST (51 pages)
- 375ST Remote (24 pages)
- 500ST Remote (23 pages)
- PRO 450 (31 pages)
- TF2 (37 pages)
- HT-974 (16 pages)
- TB-3500-6000A (20 pages)
- TB-3500-6000H (21 pages)
- TB-8000H-42 (20 pages)
- 4WS15 (27 pages)
- 750-14 (29 pages)
- 818 (35 pages)
- 875-16 (29 pages)
- 1000-20S (34 pages)
- 1050-18S (28 pages)
- 1050-18D (22 pages)
- 1050-20S (33 pages)
- 1050-20D (33 pages)
- 1050-22S (23 pages)
- 1050-22D (14 pages)
- 1051-22S (33 pages)
- 1051-22D (33 pages)
- 1075-18R (23 pages)
- 1075-22R (23 pages)
- 1325-20S (33 pages)
- 1325-20D (33 pages)
- 1325-22S (23 pages)