13

2 Installation

Alpha Technologies

2.2

Installing the Unit

2.2.1: CFR 5000

TIP: The seismic brackets can be removed if they are not required by the local code or
you are not in an earthquake zone (See

5

).

Tools and Materials Required:

• Fork lift or other means of transporting heavy objects (up to 381 lbs./173kg).

• Screwdriver or power screwdriver with a Philips bit.

5

/

8

inch socket wrench.

Procedure:

1

The unit is shipped attached to a pallet. Use a forklift or pallet jack to transport the unit and

pallet to the installation site.

2

Remove the packing from around the unit. Unbolt the unit from the pallet.

CFR 5000
attached to

pallet with 5/8
inch bolts.

3

Slide the unit off the pallet as per the included instruction sheet (017–098–C3). Move the

unit to its final position.

4

If the seismic brackets are used, mark the position on the floor where the unit will be se-

cured by using the bracket as a template. Drill holes and secure using the appropriate
anchor bolts.