Bell & Gossett V57050B SRS Pneumatic Purge Valve User Manual
Page 4
DIAPHRAGM REPLACEMENT (See Figure 6)
Required parts: EPDM screwed-in diaphragm part no. V57051
1. Turn valve to stand on the cover
18
2. Unfasten the 4 body screws
24
3. Remove body
22
and screws
24
4. Unscrew and remove old/defective diaphragm
21
5. Slightly grease screw threads in the actuator housing
1
1
(
NOTE: use lithium grease ZETGE M 51)
6. Align the diaphragm with the actuator. Mold seam of dia-
phragm must be perpendicular to the flow direction.
7. Put body
22
back on. Press down on body to start screws
24
into the actuator thread.
8. Switch actuator on and off twice, fasten screws
24
cross-
wise in unpressurized condition (torque at 5 N-m).
9. Examine valve to make sure it is operating properly and
there are no leaks.
WARNING: System fluid under pressure and/or at
high temperature can be very hazardous. Before ser-
vicing, reduce system pressure to zero or close the up-
stream shutoff valve (See No. 4 Installation Instruction
Section). Leave purge valve in open position, and allow
system fluid trapped between the shutoff valve and the
drain to drain completely. Failure to follow these instruc-
tions could result in serious personal injury or death and
property damage.
CAUTION: Diaphragm and all diaphragm connecting
parts must be kept free of petroleum based lubricat-
ing fluids and greases.
Figure 6
20
19
18
12
11
1
22
23
24
21
5
Xylem Inc.
8200 N. Austin Avenue
Morton Grove, Illinois 60053
Phone: (847) 966-3700
Fax: (847) 965-8379
www.xyleminc.com/brands/bellgossett
Bell & Gossett is a trademark of Xylem Inc. or one of its subsidiaries.
© 2012 Xylem Inc. V57050B December 2012