beautypg.com

Pro Series 7168 15K FIFTH WHEEL User Manual

Page 13

background image

CHEVROLET/GMC 88-98 / 92-98 4-DOOR / ‘99 SILVERADO

SIERRA CLASSIC (WITH TAPERED FRAME) (RED TURN SIGNALS)

CAUTION!

Read pages 2-3 of these instructions before starting installation. Failure to do so could result in significant vehicle damage!

IMPORTANT NOTES FOR THIS INSTALLATION:
1. Find parallel rows of bed sill spot welds in bed of truck. No drilling should be done in the ~4” between parallel rows of

spot welds where the bed sill sits.

Side Bracket

Axle Center

Front of

Vehicle

Rear Edge of

Truck Bed

1/4 1.5-3

1/4 2

*

1/4 2

1/4 2

*

*

Optional weld

pattern

Drivers side 1/2 ton Long Box shown

King Pin Center approx.. 1 1/2”
forward of Axle Center

Measure from Rear Edge
of truck bed to rear edge
of base rail.

Long bracket

30 15/16” Long Box
26 3/16” Short Box

Short bracket

ROW 1

ROW 2

ROW 3

ROW 4

Bed Sill

Each base rail must have a
bolt in either of the marked
center holes. Check for
obstructions before drilling.

CAUTION!

Check for obstructions before drilling. Failure to do so could result in damaged fuel or brake lines, structural members, etc.

Cequent Towing Products does its best to communicate tow vehicle manufacturer changes; however, it is ultimately the

responsibility of the installer to prevent damage due to installation.

30056IN – 21DEC05I

PCN8397

©2006 Cequent Towing Products

Litho in USA 13