Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1413 User Manual
Page 26

26
Pneg-1413 4-Leg Towers
OPTIONAL SERVICE
PLATFORM WITH
SAFETY CAGE
ASSEMBLY
STC00185
(“H” Brace)
S-456
(3/8" Hex Nuts)
S-8671
(3/8" x 1" HHCS Bolts)
STC00192
(Service
Platform
Short
Frame)
STC00180
(94-1/2" Top
Column)
S-456
(3/8" Hex
Nuts)
S-8671
(3/8" x 1" HHCS Bolts)
STC00192
(Service Platform
Short Frame)
STC00193
(Service
Platform Clip)
S-456
(3/8" Hex
Nuts)
S-8671
(3/8" x 1"
HHCS Bolts)
STC00191
(Service Platform
Long Frame)
STC00193
(Service
Platform Clip)
FIG. SP1
FIG. SP2
FIG. SP3
Assembling the service platform first and
placing the opening on the side of the tower
that will have ladder, will align ladder place-
ment. Attach ladder to service platform and
install ladders starting from the top and working
down towards bottom of tower. Be sure and
use the 10’ ladder access weldment in con-
junction with the service platform. Follow the
general layout from page 33 using the proper
ladder section as you proceed.
1.
Attach Service Platform Short Frames
(STC00192) to the 94-1/2" Top Columns
(STC00180) of the top tower section using
(4) 3/8" x 1" HHCS bolts & nuts as shown
in Fig SP1.
2.
Attach (4) Service Platform Clips
(STC00193) to the Service Platform Short
Frames (STC00192) using (2) 3/8" x 1"
HHCS bolts & nuts for each clip as shown
in Fig SP2.
3.
Attach (2) Service
Platform Long Frames
(STC00191) to the
Service Platform Clips
(STC00193) using (2)
3/8" x 1" HHCS bolts &
nuts for each clip as
shown in Fig. SP3.