Pneg-1413 4-Leg Towers

4-LEG TOWER 5' MID SECTION ASSEMBLY

STC00185
(H-Braces)

STC00183
(Vertical X-Braces)

S-3729
(1/2" Hex Nuts)

STC00181
(Column Splice Plates)

STC00226
(Internal X-
Braces)

S-7534
(1/2" x 1-1/4"
HHCS Bolts)

S-3729
(1/2" Hex
Nuts)

S-3728
(1/2" x 1-1/2"
HHCS Bolts)

STC00337
(5' Columns)

S-3728
(1/2" x 1-1/2"
HHCS Bolts)

1.

Attach Vertical X-Braces (STC00183) to the 5'
Columns (STC00337) as shown in Fig. 4 using
1/2" hardware provided.

2.

Attach the column splice plates (STC00181) to
the tops of the 5' Columns (STC00337), using
(2) 1/2" x 1-1/2" HHCS bolts (S-3729) and nuts
(S-3728) for each plate. (See Fig. 4)

3.

Repeat steps 1-2 for the opposite side, so you
have two identical sections.

SIDE 1 & SIDE 2 ASSEMBLY

SIDE 3 & SIDE 4 ASSEMBLY

1.

Connect the first two sections together by
attaching the Vertical X-Braces (STC00183) and
H-Braces (STC00185) as shown in Fig. 4, using
the 1/2" hardware provided.

2.

Attach the Internal X-Braces (STC00226) to the
H-Braces (STC00185) as shown in Fig. 4, using
the 1/2" hardware provided (S-7534 & S-3729).

FIG. 4