Assembly instructions – Grain Systems Bin Accessories PNEG-1785 User Manual
Page 56
4. Assembly Instructions
56
PNEG-1785 NCHT “X” Series Ladders
2. Assemble the platform wall brace to the intermediate platform front posts and wall angles using
5/16" x 3/4" bin bolt (S-275) (H) and flange nut (S-3611) (F).
Attach intermediate (large and small) handrail to handrail post using 5/16" x 3/4" bin bolt (S-275) (H)
and flange nut (S-3611) (F).
Attach upper handrails to platform post using 5/16" x 2" bolt (S-7877) (E) and flange nut (S-3611) (F).
Attach the platform gate bracket to the gate before attaching it to the platform back post with
5/16" x 3/4" bin bolt (S-275) (H) and flange nut (S-3611) (F).
Attach safety gate assembly to intermediate platform door bracket using 5/16" x 3/4" bin bolt (S-275)
(H) and flange nut (S-3611) (F).
Figure 4AT
Ref #
Part #
Description
Ref #
Part #
Description
A
LDR-5179
Intermediate Platform Front Post
H
S-275
5/16" x 3/4" Bin Bolt
B
LDR-5182
Intermediate Platform Top Handrail
I
LDR-5185
Intermediate Platform Door Bracket
C
LDR-4088
Small Intermediate Handrail
J
LDR-5183
Intermediate Platform Back Post - Left
D
LDR-4087
Large Intermediate Handrail
K
LDR-5174
Intermediate Platform Bracket - Left
E
S-7877
5/16" x 2" Flange Bolt
L
LDR-5168
Ladder Sidewall Angle
F
S-3611
5/16" Flange Nut
M
LDR-5206
Eave Platform Wall Brace
G
LDR-5218
Ladder Safety Gate
N
LDR-5173
Intermediate Platform Bracket - Right