beautypg.com

Right hand ladder assembly, Assembly instructions – Grain Systems Bin Accessories PNEG-1785 User Manual

Page 27

background image

4. Assembly Instructions

PNEG-1785 NCHT “X” Series Ladders

27

Right Hand Ladder Assembly

1.

Figure 4O

shows the assembly of the platform handrails. These must be attached using

5/16" hardware.

a. Attach large and small intermediate handrails to platform posts using 5/16" x 3/4" bin bolt

(S-275) (H) and flange nut (S-3611) (I).

b. Attach long and short upper handrails to platform posts using 5/16" x 2" bolt (S-7877) (J) and

flange nut (S-3611) (I).

c. Attach short intermediate handrail to platform posts using 5/16" x 3/4" bin bolt (S-275) (H) and

flange nut (S-3611) (I).

d. Attach inside top handrail to platform posts using 5/16" x 2" bolt (S-7877) (J) and flange

nut (S-3611) (I).

Figure 4O

Ref #

Part #

Description

15'-21'

24'-36'

A

STX-0038

STX-0038

Platform Handrail Short

B

LDR-5375

LDR-5352

Platform Handrail Long

C

STX-0147

STX-0147

Inside Top Handrail

D

LDR-5366

LDR-5366

Short Intermediate Handrail

E

LDR-5352

LDR-5352

Platform Handrail Long

F

LDR-4088

LDR-4088

Small Intermediate Handrail (Field Cut to Length)

G

LDR-4087

LDR-4087

Large Intermediate Handrail (Field Cut to Length)

H

S-275

S-275

5/16" x 3/4" Bin Bolt

I

S-3611

S-3611

5/16" Flange Nut

J

S-7877

S-7877

5/16" x 2" Flange Bolt

K

Place self-drilling screw on bottom at overlap.