beautypg.com

Rough Country 488.20 User Manual

Page 7

background image

MAINTENANCE INFORMATION

It is the ultimate buyers responsibility to have all bolts/nuts checked for tightness after the first 500 miles and then every
1000 miles. Wheel alignment steering system, suspension and driveline systems must be inspected by a qualified pro-
fessional mechanic at least every 3000 miles.

Thank you for purchasing a Rough Country Suspension Kit. Please consider the addi-

tional options offered by Rough Country and shown below for your F250/F350.

REAR BRAKE LINE INSTALLATION INSTRUCTIONS

1. Remove the factory brake line from the metal line on the frame rail.
2. Remove the stock line from the brake line block on the axle.
3. Install the new supplied braided steel line in the stock location as shown in Photo 1 & 2.
4. Tighten

fittings.

Please be sure to bleed the brake line system and after both front and rear lines have been

installed to ensure the brake system is functioning correctly and to full capacity.

Photo 2

Photo 1

REAR DUAL SHOCK KIT

PART #1403

DUAL STABILIZER KIT

PART #87490

FRONT DUAL SHOCK KIT

PART #1402