Rough Country 789.22 User Manual
Page 9
56. On the front sway disconnects, assemble the supplied jam nut and end link on the sway bar link body. Adjust the
sway bar to approx 11” for a 4” & 6” kit measuring end to end. Tighten the end and jam nut using a 18mm wrench.
57. Install the new sway bar link on the factory sway bar as shown in Photo 34 with the supplied 12mm Flange lock nut
using a 16mm & 18mm wrench.
58. Install the new sway bar link on the sway bar bracket and swing up the assembly to the frame rail. See Photo 35.
Remove the sway bar link from the bracket while holding the bracket in place.
59. Mark the holes to be drilled and remove the bracket from the frame. See Photo 36.
60. Drill the two holes per side using a 17/64” drill bit. See Photo 37. Be sure to only drill through outside of the frame.
61. Install the frame bracket with the supplied 5/16” self tapping bolts (2 per bracket) using a 1/2” wrench. SeePhoto 38.
62. Install the supplied mounting pin on the axle as shown in Photo 39. Use a punch or screw driver to hold the pin and
tighten using 19mm socket / wrench.
PHOTO 35
PHOTO 34
PHOTO 36
PHOTO 37
PHOTO 38
PHOTO 39