Rough Country 1117 User Manual
Page 4
Thank you for purchasing a Rough Country Suspension System.
POST INSTALLATION INSTRUCTIONS
1. Check all fasteners for proper torque.
2. Have headlight readjusted to proper settings.
3. Take the vehicle to be aligned to factory specifications by a certified alignment shop.
4. Re torque all fasteners after 500 miles. Visually inspect components and re torque fasteners during routine vehicle
service.
MAINTENANCE INFORMATION
It is the ultimate buyers responsibility to have all bolts/nuts checked for tightness after the first 100 miles and then
every 100 miles. A qualified mechanic must inspect wheel alignment steering system, suspension and driveline systems
at least every 3000 miles
.
KIT CONTENTS:
2-SHACKLE
HANGER
BRACKETS
2-SHACKLE
RELOCATION
BRACKETS
2-FLAG
NUT
BRACKETS
1-POLY
BAG
POLY BAG CONTENTS:
4-7/16” X 1 1/4” BOLTS
4-7/16” FLAT WASHERS
4-1/2” X 1 1/4” BOLTS
4-1/2” FLAT WASHERS
4-14MM X 110MM BOLTS
8-14MM FLAT WASHERS
4-14MM LOCK NUTS
Shackle Hanger (2)
Shackle Hanger
Frame Bracket (2)
Shackle Bracket
Strap (2)