Warrior SR 180-1 SYSTEM (1955–1975 Jeep CJ5) User Manual
Page 2

Protecting Your Adventure Lifestyle
========================================================================================
QUALITY • INTEGRITY • INNOVATION • SERVICE
Warrior Products, Inc.
16850 SW Upper Boones Ferry Rd
Ste. A
Durham, OR 97224
Phone (888) 220-6861
Fax (503) 692-0364
and washers supplied in your kit. Do not tighten at this time.
13) Install upper end of shackle to the spring hanger located on the frame using _” x 3 _” NC Zinc bolt, nuts and
washers supplied in your kit. Do not tighten at this time.
14) Lower front housing onto leaf springs, be sure leaf spring locating pin is in correct location, reinstall front u-bolts,
replace all that were stripped upon removal, not supplied in kit, torque to factory specifications.
15) Install front wheels and tires; tighten to factory specifications, lower jeep back onto ground.
16) Push up and down on front of jeep several times so the shackle can move into its resting position. Now tighten the
shackle bolts as follows: the bottom bolt, one through leaf spring should be tightened to 45 ft. lbs. of torque and the
top bolt through the frame bracket should be tightened to 35 ft. lbs. of torque.
17) Check all bolts for tightness; yes again, especially front four bolts.
18) For added strength you may wish to tac-weld front leaf spring bracket, do not make continuous welds, paint all
welds after they have had time to cool.
19) Enjoy the way your Jeep now drives with your SR-180 SYSTEM.
***ALL WELDING MUST BE DONE BY A CERTIFIED WELDER***
***IF YOU ARE IN DOUBT, CALL FACTORY BEFORE WELDING***