Veris Technologies 3100 Soil EC Mapping System (1997-2008 CF card drive 1.77D) - Operating Instructions User Manual
Page 7
Veris Technologies
Pub. #OM 1CM02-1
7
No continuity
Grounded Bolt
Coulter terminal
3) Implement Test Box
– To properly measure conductivity, good electrical continuity must
be present from the coulter electrode to the instrument. The Implement Test Box (Part
No. 10759) allows you to quickly check this.
Use the following method:
a) Connect the signal cable to the terminal on the test box.
b) Touch one lead of an ohmmeter to the #1 coulter blade (left hand, standing behind
the unit) and the other lead to the #1 terminal on the test box. A reading of less than
2 ohms is normal.
Connect to coulter blade
Ohmmeter
Test Box