Shogun Motorsports Kawasaki ZX6R (09-12) Frame Slider User Manual
Shogun Motorsports For motorcycles
Kawasaki ZX6R (09-12) Frame Slider Installation
Instructions
Part Numbers: 750-4439, 750-4430 &755-4439
MADE IN THE USA!
Carefully read instructions in their entirety before the install
Professional installation is recommended. Always use proper safety measures during the install of this
product. Do not try to install this product without proper tools, recently calibrated torque wrench,
correct torque specifications from factory service manual, safety goggles and gloves. The motorcycle
must be in a fixed secure position before the install process begins.
DO NOT
remove both engine studs
at the same time.
Shogun is not responsible for any part of your motorcycle for any reason.
Precisely
measure location of cut and if in doubt at any point please call us before the install process has begun.
Replacement Parts List: Left Side Components (as if you were sitting on the bike)
QTY
Price each
Part Numbers
Descriptions
1
$20.00
99-FS-750-4439-L
Black Left Side Puck
1
$20.00
99-FS-750-4430-L
White Left Side Puck
1
$10.00
428-9091
Left Hand Spacer
1
$3.50
99-HB-SH10125110
Socket Cap 10 X 1.25 X 110 Main Engine Stud
Replacement Parts List: Right Side Components (as if you were sitting on the bike)
1
$20.00
99-FS-750-4439-R
Black Right Side Puck
1
$20.00
99-FS-750-4430-R
White Right Side Puck
1
$10.00
428-9092
Right Hand Spacer
1
$3.50
99-HB-SH10125110
Socket Cap 10 X 1.25 X 110 Main Engine Stud
Frame Slider Lengths: Shorter frame slider and longer spacer mount to the left hand side.
Installation Steps:
1.
Some photos in this section are used for illustration examples only
. It is up to you how you
decide to cut your motorcycles bodywork to accept the frame slider there are many different
ways customers go through this process.
Shogun is not responsible for any part of your
motorcycle for any reason.
Precisely measure location of cut and if in doubt at any point please
call us before the install process has begun.
Professional installation is recommended.
Always
use proper safety measures during the install of this product. Do not try to install this product
without proper tools, recently calibrated torque wrench, correct torque specifications from
factory service manual,
safety goggles and gloves.
2.
Body Prep. Use masking tape to completely mask off the area on the body where you will be
working. We usually will tape off approximately 6 to 8 inches around the though hole area and
any other edges that could get bumped or scratched while working. Tip: In some locations you
may want to double up the thickness of the masking take to give extra protection.