3Com 1000 User Manual
Page 4

Configuration Rules for Fast Ethernet 2-2
Configuration Rules with Full Duplex 2-2
Installing the Switch 1000 2-4
Stacking the Switch and Other Units 2-4
Connecting a Redundant Power System (RPS) 2-6
Connecting Equipment to the Console Port 2-7
Connecting a VT100 Terminal 2-7
Connecting a VT100 Terminal Emulator 2-7
Connecting a Workstation Running SLIP 2-8
Methods of Managing the Switch 1000 3-1
Using the VT100 Management Interface 3-1
Obtaining a Registered IP Address 3-3
Navigating the VT100 Screens 3-4
Setting Up the Switch for Management 3-6
Choosing a Switch Management Level 4-7
Setting Up the Switch Unit 4-9
Setting Up the Switch Ports 4-12
Setting Up the Switch Database (SDB) 4-16
Searching the Switch Database 4-18
Adding an Entry into the SDB 4-18
Deleting an Entry from the SDB 4-18
Specifying that an Entry is Permanent 4-18
Setting Up Resilient Links 4-19
Configuring Resilient Links 4-20
Creating a Resilient Link Pair 4-21
Deleting a Resilient Link 4-21
Viewing the Resilient Setup 4-22