RIGGING AND HANDLING
Exercise care when moving the unit. Do not remove any
packaging until the unit is near the place of installation. Rig
the unit by attaching chain or cable slings to the lifting holes
provided in the base rails. Spreader bars, whose length
exceeds the largest dimension across the unit, MUST be
used across the top of the unit.
Units may be moved or lifted with a forklift. Slotted openings
in the base rails are provided for this purpose.
LENGTH OF FORKS MUST BE A MINIMUM OF 60 INCHES
(1524 mm).
If a unit is to be installed on a roof curb other than a
YORK roof curb, gasketing must be applied to all
surfaces that come in contact with the unit under-
side.
Before lifting, make sure the unit weight is distrib-
uted equally on the rigging cables so it will lift evenly.
All panels must be secured in place when the unit is
lifted.
The condenser coils should be protected from rig-
ging cable damage with plywood or other suitable
material.
FIGURE 5 -
UNIT 4 POINT LOAD
D
A
C
B
L E F T
F R O N T
TABLE 3: UNIT WEIGHTS
Model
Shipping Weight lb. (kg)
Operating Weight
lb. (kg)
BP090
1108 (503)
1103 (500)
BP120
1212 (550)
1207 (547)
Econ.
85 (39)
84 (38)
w/ PE
150 (68)
148 (67)
Elec.
Heat
*
*.
54kW heater.
49 (22)
49 (22)
TABLE 4: 4 POINT LOAD WEIGHT
Model
Location lbs. (kg)
A
B
C
D
BP090
242 (109)
207 (94)
301 (137)
353 (160)
BP120
265 (120)
226 (103)
330 (150)
386 (175)
TABLE 5: 6 POINT LOAD WEIGHT
Model
Location lbs. (kg)
A
B
C
D
E
F
BP090
166
(75)
149
(68)
134
(61)
196
(89)
217
(98)
242
(110)
BP120
181
(82)
163
(80)
147
(67)
214
(97)
237
(108)
264
(120)
FIGURE 6 -
UNIT 6 POINT LOAD
FIGURE 7 -
UNIT CENTER OF GRAVITY
D
A
C
B
E
F
L E F T
F R O N T
F R O N T
L E F T
4 1 "
( 1 0 4 0 )
2 4 "
( 6 1 0 )
N O T E : ( x x x ) i n d i c a t e s
d i m e n s i o n s i n
m i l l i m e t e r s