beautypg.com

Continuity test chart door open, Door closed – Whirlpool 1997 "E" User Manual

Page 64

background image

3-24

CONTINUITY TEST CHART

DOOR OPEN

L1

SECONDARY

INTERLOCK

SWITCH

PRIMARY

INTERLOCK

SWITCH

MONITOR

SWITCH

N

L1

SECONDARY

INTERLOCK

SWITCH

PRIMARY

INTERLOCK

SWITCH

MONITOR

SWITCH

N

DOOR CLOSED

PRIMARY, MONITOR, & SECONDARY SWITCH

CHECKOUT PROCEDURE

NOTE: The following chart and strip circuits show the continuity and position of the door switches
when the microwave oven door is open and closed.

SWITCH

TESTING

DOOR

OPEN

DOOR

CLOSED

Primary

Interlock

Disconnect the 3-pin connector CN3 from the control
module. Check from the pink wire (pin 1) to the blue
wire (pin 3).

+

Secondary

Interlock

Disconnect the wires at the Secondary Interlock Switch.
Check from the common terminal (white wires) to the
normally-open terminal (white wires).

+

Monitor

Disconnect the wires from the Monitor Switch. Check
from the common terminal (white wires) to the
normally-closed terminal (red wire).

+

(+) = CONTINUITY
(–) = NO CONTINUITY