beautypg.com

Prepare boiler location — air openings, Cgs-4e gas-fired water boiler — boiler manual, Special considerations – Weil-McLain GOLD CGS-4E User Manual

Page 10: Combustion air requirements, Sizing air openings

background image

Part number 550-110-282/1108

10

GOLD

CGs-4E Gas-Fired Water Boiler — Boiler Manual

Prepare boiler location — air openings

1e

Special considerations

Tight construction

ANSI Z223.1 defines unusually tight construction

where:

1. Walls and ceilings exposed to the outside atmo-

sphere have a continuous water vapor retarder with

a rating of 1 perm or less with openings gasketed,

and . . .

2. Weather-stripping has been added on openable

windows and doors, and . . .

3. Caulking or sealants are applied to areas such as

joints around windows and door frames, between

sole plates and floors, between wall-ceiling joints,

between wall panels, at penetrations for plumbing,

electrical, and gas lines, and in other openings.

For buildings with such construction, provide air open-

ings into the building from outside, sized per the ap-

propriate case in

Figure 3

if appliances are to use inside

air for combustion and ventilation.

Exhaust fans and air movers

The appliance space must never be under a negative

pressure unless all appliances are installed as direct vent.

Always provide air openings sized not only to the dimen-

sions required for the firing rate of all appliances, but

also to handle the air movement rate of the exhaust fans

or air movers using air from the building or space.

Motorized air dampers

If the air openings are fitted with motorized dampers,

electrically interlock the damper to:

• Prevent the boiler from firing if the damper is not

fully open.

• Shut the boiler down should the damper close dur-

ing boiler operation.

To accomplish this interlock, wire an

isolated contact

(proving the damper open) in series with the thermo-

stat input to the boiler. The boiler will not start if this

contact is open, and will shut down should it open

during operation.

Combustion air requirements

Using outside air — direct vent only

Combustion air must be ducted directly from outside to the CGs-4E boiler

air intake fitting. This method is defined as

direct vent

(also referred to

as sealed combustion). Refer to the appropriate vent supplement and the

instructions in this manual. Two options are available: sidewall or vertical

direct vent. Each requires a special vent component kit.

Sizing air openings

Air openings provide for ventilation to prevent overheating of the boiler

controls and boiler space. Air is also needed for other appliances located

in the same space.
Use

Figure 3

, page 11, selecting the appropriate installation conditions. Note

that the sizing given in Figure 3 applies only to CGs-4E installations with

clearances no smaller than shown in Figure 1, page 7

of this manual.

For smaller clearances, regardless of how the air openings are arranged, two

openings providing free area of 1 square inch per 1,000 Btuh input of all

appliances in the space are required.

Air openings must be sized to handle all appliances and

air movers (exhaust fans, etc.) using the air supply.

The sizing given in Figure 3 is based on the National Fuel Gas Code, ANSI

Z223.1, allowing adequate air opening for gravity-vented gas appliances

(Category I). The CGs-4E boiler is rated Category IV (pressurized vent),

and has different requirements for combustion and ventilation air, reflected

by the special sizing instructions given in Figure 3. The air openings rec-

ommended in Figure 3 will allow adequate ventilation and combustion

air provided the boiler room is not subjected to negative pressure due to

exhaust fans or other mechanical ventilation devices. Refer to the National

Fuel Gas Code for dealing with other conditions.

Louver allowance

The free area of openings means the area

after reduc-

tion for any installed louvers or grilles

. Be sure to

consider this reduction when sizing the air openings.

Air opening location and sizing requirements de

-

pend on the clearances around the boiler.

Check

the boiler placement compared to Figure 1, page 7.

If all clearances are at least equal to Figure 1,

page 7

, apply the sizing and placement of openings

given on pages 10 and 11.

If ANY clearance is less than Figure 1, page 7

,

you must provide air openings sized and located

as shown in Figure 2, page 7.

DO NOT

apply the

sizing and location information shown on page 10

or 11. The Figure 2 air openings are required even if

the boiler is direct vented (outside air piped to the

boiler air intake as described in this manual). These

openings ensure adequate air circulation around the

boiler for cooling, even if the boiler does not use

inside air for combustion.