beautypg.com

Wayne-Dalton TORSION SPRING 9100 User Manual

Page 21

background image

21

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

Tools Needed:

Tools Needed:

INST

ALLA

TION

Torsion End Bearing Brackets

End bearing brackets are right and
left. Using the slots in the lower fl ange
of the end bearing bracket, align the
bracket with the fl agangle on top of the
horizontal angle and secure the end
bearing bracket to the horizontal angle
using (2) 3/8”- 16 x 3/4” hex head bolts
and (2) 3/8”- 16 nuts.

Once the bracket is secured to the
horizontal angle, secure the top of the
end bearing bracket to the jamb using
(2) 5/16” x 2” lag screws. Repeat for
other side.

NOTE: Right and left hand is always
determined from inside the garage
looking out.

Power Drill

7/16” Socket

Driver

9/16” Socket

Ratchet Wrench

9/16” Wrench

LEFT END BEARING BRACKET

HORIZONTAL ANGLE

(2) 5/16” X 2”

LAG SCREWS

(2) 3/8”- 16 X 3/4”

HEX HEAD BOLTS

(2) 3/8”- 16

HEX NUTS

Center Bearing Bracket

Power Drill

7/16” Socket

Driver

Level

Tape Measure

Pencil

1/4” Torx Bit

Measure to locate the center of the door
and mark a vertical pencil line on the
mounting surface above the door, to
indicate the center line of the door. Then,
measure from the center of the bearing, in
one of the end bearing brackets, DOWN to
the top of the door. Using that dimension,
measure UP from the top of the door
and mark a horizontal pencil line on the
mounting surface, intersecting the vertical
pencil line. Now align the edge of the
center bearing bracket along the vertical
pencil line on the mounting surface. Center
the bearing bracket on the horizontal
line. This will ensure the torsion tube is
level between the center and end bearing
brackets. Attach the center bearing bracket,
in this location, to the mounting surface,
using (2) 5/16” x 2” lag screws and
(1) 5/16” x 2” tamper-resistant lag screw.

IMPORTANT: USE THE 5/16” X 2” TAMPER-
RESISTANT LAG SCREW ONLY IF MOUNTING
SURFACE MOUNTED OVER MASONRY.
TAMPER-RESISTANT LAG SCREW MUST BE
ATTACHED THROUGH THE BOTTOM HOLE
OF THE CENTER BEARING BRACKET.

VERTICAL LINE

MOUNTING SURFACE

EQUAL DISTANCE

CENTER OF

END BEARING

BRACKET

HORIZONTAL LINE

CENTER BEARING

BRACKET

CENTER

BEARING

BRACKET

(2) 5/16” X 2”

LAG SCREWS

MOUNTING
SURFACE

HORIZONTAL LINE

VERTICAL

LINE

14

15

(1) 5/16” X 2”

TAMPER-RESISTANT LAG SCREW

OR (1) 5/16” X 2” LAG SCREW

This manual is related to the following products: