9-3-3. Evacuating

After the piping has been connected to the indoor unit,
you can perform the air purge together at once.

AIR PURGE
Evacuate the air in the connecting pipes and in the
indoor unit using a vacuum pump. Do not use the
refrigerant in the outdoor unit. For details, see the
manual of the vacuum pump.

Be sure to use a vacuum pump with counter-flow
prevention function so that inside oil of the pump does
not flow backward into pipes of the air conditioner
when the pump stops. (If oil inside of the vacuum pump
enters into the air conditioner, which use R410A,
refrigeration cycle trouble may result.)
1. Connect the charge hose from the manifold valve to

the service port of the gas side packed valve.

2. Connect the charge hose to the port of the vacuum

pump.

3. Open fully the low pressure side handle of the

gauge manifold valve.

4. Operate the vacuum pump to start evacuating.

Perform evacuating for about 15 minutes if the
piping length is 20 meters. (15 minutes for
20 meters) (assuming a pump capacity of 27 liters
per minute. Then confirm that the compound
pressure gauge reading is –101 kPa (–76 cmHg).

5. Close the low pressure side valve handle of gauge

manifold.

6. Open fully the valve stem of the packed valves

(both side of Gas and Liquid).

7. Remove the charging hose from the service port.
8. Securely tighten the caps on the packed valves.

Fig. 9-3-7

Tightening torque of flare pipe connections

The operating pressure of R410A is higher than that of
R22. (Approx. 1.6 times).
It is therefore necessary to firmly tighten the flare pipe
connecting sections (which connect the indoor and
outdoor units) up to the specified tightening torque.
Incorrect connections may cause not only a gas
leakage, but also damage to the refrigerant cycle.

Fig. 9-3-5

1. How to shape the pipes

Shape the pipes along the incused line on the
outdoor unit.

2. How to fit position of the pipes

Put the edges of the pipes to the place with a
distance of 85 mm from the incused line.

Fig. 9-3-6

(Unit : N·m)

Outer dia.

Tightening torque

of copper pipe

6.35 mm

16 to 18 (1.6 to 1.8 kgf·m)

9.52 mm

30 to 42 (3.0 to 4.2 kgf·m)

Flare at
indoor unit side

Flare at
outdoor unit side

Incused line

85

m

m

CAUTION

KEEP IMPORTANT 4 POINTS FOR PIPING
WORK

(1) Take away dust and moisture (Inside of the

connecting pipes.)

(2) Tight connection (between pipes and unit)
(3) Evacuate the air in the connecting pipes using

VACUUM PUMP.

(4) Check gas leak (connected points)

Compound
pressure
gauge

Pressure gauge

Manifold valve

Handle Hi
(Keep full closed)

Charge hose
(For R410A only)

Vacuum pump
adapter for
counter-flow
prevention
(For R410A only)

Packed valve at liquid side

Packed valve at gas side

Service port
(Valve core (Setting pin))

Connecting
pipe

Handle Lo

Charge hose
(For R410A only)

-101kPa
(-76cmHg)

Vacuum
pump