Stages of installation on the network – Toshiba GA-1120 User Manual
Page 14
1
1-2
Connecting to the Network
Stages of installation on the network
Installation can be performed by a network or printing administrator. The stages of a
successful installation are:
•
Physically connecting the GA-1120 to a functioning network
Prepare a network node for the GA-1120—obtain cable, route it to the location where
the GA-1120 will be installed, and attach the cable to the network interface (for
details, see
).
N
OTE
:
If you plan to run Command WorkStation software, you will need to install the
software and connect the Command WorkStation computer to the network along with
the GA-1120. For more information, see the
User Software Installation Guide
.
•
Configuring the network server
When network servers are required, you need to configure those servers to provide
client access to the GA-1120 as a color PostScript printer. For information on
configuring network servers in Windows and UNIX network environments, see
.
•
Setting up the GA-1120
Configure the GA-1120 for your particular printing and network environment.
First read
, and then see subsequent chapters for details.
•
Preparing client workstations for printing
Install the files needed for printing, install additional user software, and connect the
client to the GA-1120 over the network. These steps are described in the
User Software
Installation Guide
, and some information is also provided in
•
Administering the GA-1120
Monitor and maintain system performance and troubleshoot problems that arise.
For details, see
of this manual and the
Job Management Guide
.