beautypg.com

Stages of installation on the network – Toshiba GA-1120 User Manual

Page 14

background image

1

1-2

Connecting to the Network

Stages of installation on the network

Installation can be performed by a network or printing administrator. The stages of a
successful installation are:

Physically connecting the GA-1120 to a functioning network

Prepare a network node for the GA-1120—obtain cable, route it to the location where
the GA-1120 will be installed, and attach the cable to the network interface (for
details, see

page 3-9

).

N

OTE

:

If you plan to run Command WorkStation software, you will need to install the

software and connect the Command WorkStation computer to the network along with
the GA-1120. For more information, see the

User Software Installation Guide

.

Configuring the network server

When network servers are required, you need to configure those servers to provide
client access to the GA-1120 as a color PostScript printer. For information on
configuring network servers in Windows and UNIX network environments, see

Chapter 2

.

Setting up the GA-1120

Configure the GA-1120 for your particular printing and network environment.
First read

Chapter 2

, and then see subsequent chapters for details.

Preparing client workstations for printing

Install the files needed for printing, install additional user software, and connect the
client to the GA-1120 over the network. These steps are described in the

User Software

Installation Guide

, and some information is also provided in

Chapter 2

.

Administering the GA-1120

Monitor and maintain system performance and troubleshoot problems that arise.
For details, see

Chapter 7

of this manual and the

Job Management Guide

.