341
Checking Status with the Network Configurator
Section 14-1
Status 2 Tab Page
The Status 2 Tab Page’s Target PLC Status Field shows the status of the tar-
get node PLCs that are connected with the EtherNet/IP Unit as the tag data
link originator. The icon will be blue if the CPU Unit is in RUN mode or MONI-
TOR mode, gray if it is in PROGRAM mode, or red if an error occurred.
The Connected Status of FINS/TCP Connections Field shows the status of
FINS/TCP connections. There will be a check mark in the box when the corre-
sponding connection is established (connected).