Omron SYSMAC CJ1W-EIP21 User Manual
Page 319

293
Tag Data Link Performance for CJ2M Built-in EtherNet/IP Ports
Section 10-4
For example, the maximum and minimum I/O response times would be as fol-
lows for the above system.
Maximum response time:
1.5 ms + 5 ms
×
2 + 12 ms + 10 ms
×
2 + 2.0 ms = 45.5 ms
Minimum response time:
1.5 ms + 5 ms + 10 ms + 2.0 ms = 18.5 ms
Note
If the message service is used at the same time on the CJ2M built-in port, the
tag data link I/O response time will change.
This manual is related to the following products: