beautypg.com

Pre-operation inspection and service, Pre-operation inspection and service -14, Operation – Rhino Mounts SE4 User Manual

Page 94: Opera t ion

background image

OPERATION

SE4 05/05

Operation Section 4-14

© 2005 Alamo Group Inc.

OPERA

T

ION

Shorten the driveline profiles as follows:

Remove the driveline from the tractor.

Position the mower to the point with the
shortest distance between the tractor PTO
shaft and cutter gearbox. Shut down the tractor
and securely block the mower in this position.

Pull driveline apart and reattach yoke to PTO
shaft.

Hold driveline sections parallel to one another
and measure back 1” from yoke of each shaft
and place mark on opposite section. Cut this
length off with a saw.

Round off all sharp edges and debur.

Thoroughly grease then reinstall the driveline.

Recheck for proper operation.

Engagement Check Procedure

With the driveline attached, position the mower to the point where the telescoping driveline is at its
maximum extension. Completely shut down the tractor and secure in position.

Mark the inner driveline shield 1/8” from the end of the outer shield.

Disconnect the driveline from the tractor and separate the two driveline halves.

Measure the distance from the mark to the end of the inner profile. This length is the amount the driveline
profiles were engaged.

If the engaged length is less than 12” for a CV driveline and less than 6” for a non-CV driveline, the shaft is
considered too short and should be replaced with a longer shaft. Consult an authorized dealer to
purchase the required driveline length.

NOTE: If the driveline cannot be shortened and still maintain the required profile engagement, the operator
must be made aware of terrain conditions and avoid situations which pose a potential problem to avoid
damaging the driveline.
OPS-R-0005

8. PRE-OPERATION INSPECTION AND SERVICE

Before each use, a pre-operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing
parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided. OPS-U-0029

Always disconnect the main PTO Driveline from the Tractor before performing service on the
Implement. Never work on the Implement with the tractor PTO driveline connected and running.
Rotating Parts, Blades or Drivelines could turn without warning and cause immediate
entanglement, injury or death.

(S3PT-11)