beautypg.com

Mounting the mgc-100 on a 19” rack, Mounting the mgc-100 on a 19” rack -6, Chapter 2 - hardware installation – Polycom DOC2237A User Manual

Page 26: 19" attachment bar

background image

Chapter 2 - Hardware Installation

2-6

8.

Place the MCU in a 23” rack and while supporting it, screw the mounting
brackets to the rack securing it with bolts and self-locking nuts.

Mounting the MGC-100 on a 19” Rack

The MGC-100 can be mounted in a 19” rack using the mounting kit (P/N-
KIT2026A). It is highly recommended that the 19” rack be located in an air-
conditioned room.

Figure 2-3 shows how to mount the MGC-100 on the 19” rack.

Figure 2-3: MCU Rack Mount

When the unit is installed on a rack, the rack must be properly grounded to the
central office ground. The rack must be grounded with two-hole compression-
type connectors using copper conductors (tinned or untinned). Wire, bus bar or
braided strap connectors are acceptable.

Po

w

e

r

L1

L2

L3

C

rit

ic

al

Ma

jo

r

M

inor

L0

PWR

IN

OU

T

CO

NT

PWR

IN

OU

T

PWR

IN

OU

T

Li

ne A

Line B

St

b

y

Fa

il

Act

iv

e

St

b

y

Fa

il

Ac

ti

ve

St

b

y

Fa

il

Ac

ti

ve

St

b

y

Fa

il

Act

ive

St

b

y

St

b

y

Fa

il

F

a

il

Act

ive

Ac

ti

ve

St

b

y

Fa

il

Ac

ti

v

e

S

tby

S

tby

F

a

il

F

a

il

A

c

ti

v

e

A

c

ti

v

e

St

b

y

Fa

il

Ac

ti

v

e

S

tby

S

tby

Fa

il

F

a

il

A

c

ti

v

e

A

c

ti

v

e

St

b

y

Fa

il

Ac

ti

ve

St

b

y

Fa

il

Ac

ti

v

e

St

b

y

Fa

il

Ac

ti

ve

NE

T

-E

1

M

U

X

M

U

X

DA

T

A

D

A

T

A

V

IDE

O

V

ID

E

O

V

IDE

O

A

UDI

O

V

IDE

O

A

UD

IO

St

b

y

Fa

il

Act

iv

e

AU

D

IO

AU

D

IO

Li

ne 6

Li

ne 7

Li

ne 8

Li

ne 3

Li

ne 4

Li

ne 5

Line 1

Line 2

Line 6

Line 7

Line 8

Line 3

Line 4

Line 5

Line 1

Line 2

Li

ne 6

Li

ne 7

Li

ne 8

Li

ne 3

Li

ne 4

Li

ne 5

Line 1

Line 2

NE

T

-8

NE

T

-8

N

E

T

-8

19" Attachment Bar