Mgc-100 hardware installation, Unpacking and positioning the mgc-100, Mgc-100 hardware installation -2 – Polycom DOC2237A User Manual
Page 22: Unpacking and positioning the mgc-100 -2
Chapter 2 - Hardware Installation
2-2
MGC-100 Hardware Installation
Unpacking and Positioning the MGC-100
To unpack and position the MGC-100:
1.
When you receive your MGC-100, inspect the equipment for damage
and verify that the components match the packing slip. If you did not
receive a component or if there is damage to the system, notify your
service representative immediately.
Figure 2-1: MGC-100 package
2.
Place the MGC-100 unit on a stable flat surface in a location that meets
the MGC environment requirements, which are:
•
Operating temperature: 10°–40°C (50°–104°F)
•
Humidity: 15%–90% non-condensing
•
Altitude: Up to 3,000m (10,000ft)
•
ESD: +8 kV
Carrying Strap
Lock in Open Position
Wood Packing Case
Lock in Closed Position